The UAE is also going to be on Mars: launching unmanned detectors in 2020

According to foreign media reports, the UAE President has announced that in 2020, an unmanned Mars probe will be launched to monitor the Martian atmosphere from orbit. Named "Hope", the probe will further expand the country's space activities and participate in competition with emerging space powers such as China and India.

UAE President Khalifa-Ben Zayed Al-Nahyan said that this Mars probe will begin to enter the space exploration era on behalf of Muslim countries. Currently, the scientific survey mission of this detector is to map the Martian climate and develop the Martian atmosphere.

So far, the Emirates has only launched two small Earth observation satellites, so the "Hope" Mars probe is a major space strategy. The detector will carry an optical spectrum analyzer to analyze infrared and ultraviolet signals, and at the same time assemble a digital camera. Its space mission is to measure the water, dust and other particles in the atmosphere of Mars, trying to understand how Mars has transitioned from wet and warm in ancient times to today's dry and dusty environment. .

The "Hope" Mars exploration mission is similar to the one launched by NASA and the Indian Space Research Organization in 2014. David Brain, of the University of Colorado, said: "The Hope Mars probe is very unique. And with the MAVEN (Mars atmosphere and volatile evolution) detectors, the scientific survey mission is complementary to the MAVEN detector."

The Installation of Mounting Unit
1. Make the concrete base according to solution drawing, locate embedded bolts and set out strings by Laser Level to ensure the centers of embedded bolts in the same elevation as accurate as possible on vertical, horizontal direction and at end face.
2. Locate the Anchor Plate on the concrete base and adjust the position according to solution drawing(remove M14 washer,M14 spring washer,and M14 nut if they are connected to embedded bolts now),and then fasten M14 washer, M14 spring washer, and M14 nut with the tightening torque of 60N.m.
3.Take out the Hexagon Bolt Kit with Post B Corrugated Gasket M12x95 and remove its nut, spring washer, one washer, and corrugated gasket. Insert the Post A, B, C in to Anchor Plate according to the Hexagon Bolt Kit with Corrugated Gasket M12x95 drawing and then fix them by two sets of Hexagon Bolt Kit with Corrugated Gasket M12*95. Post C Post A
4.Remove the bolt kits M12*90 from all the Posts and Pre-Assembled Supports and unfold the embedded Supports, fasten them on the Posts by bolt kits M12*90 according to the drawing. 

Installation of Rails
1.Please check the length of Beam before place it onto the Pre-Assembled Supports, otherwise extend it with Splice forBeam first. There are 4 self-tapping screws in each side and total 8 self- tapping screws in both sides. We strongly recommend NOT extend the Beams on Preassembled Supports.
2.Before locate the Beams, mark the position of the Beam son the surface of Pre-Assembled Supports with maker pens according to solution drawing for easier installation. Place the Beams on the 55*80 Tube of Pre-Assembled Supports and fix it with C Clamp Kits. Install all the Beams in the same step. The tightening torque will be 20N.m. C Clamp Kit Side Beam(Please arrange 3-4 persons to install when the array is long.)

Installation of Solar Panels
1.Place the panels above the Beam 85, fixing it with Wide End Clamp Kit in the side and Inter Clamp Kit in the middle. Install all the panels in the same steps until complete installation of al panels. Fasten all the bolts with tightening torque of 10N.m.
2.Complete installation, and please inspect and make sure all the bolts are fastened.

Solar Mounting System For Green House

Solar Panel Mounting Frames,Solar Panel Mounting Systems,Greenhouse Solar Mounting System,PV Mounting Systems

Hebei Honde Plastic & Metal Co., Ltd. , https://www.foundation-system.com